|
| After-sale
Service Project for Speed-up Coach |
|
|
In view of the keen competition of transportation market, MOR decided to carry out speed up run throughout the railway system since April 1997. |
| |
|
 |
| The
Engineering Supervision of Qinhuangdao-Shenyang Passenger Dedicated
Line |
|
|
The supervision of No.V section of supervision project on Qinhuangdao-Shenyang line is in charged by Railway Engineering Research Institute of CARS. |
| |
|
 |
| Quality Inspection Of Qinghai-Tibet Railway Project |
|
|
As China stepped into the new century, Qinghai-Tibet railway, as a key project in the West Development Program, fully commenced construction on June 29, 2002. |
| |
|
 |
| Alumino-thermit welding project of Qinhuangdao-Shenyang dedicated passenger line |
|
|
The Qinhuangdao-Shenyang dedicated passenger line is 404.64km in length and is the first home-designed passenger dedicated line with a design and operation speed exceeding 200km in China and also the first CWR in China. |
| |
|
 |
| Comprehensive Monitoring System of Train Operating Safety for Shanghai-Nanning Line |
|
|
Comprehensive Monitoring System of Train Operating Safety for Shanghai-Nanning Line was put forward by MOR in National Innovation Conference of Railway Technology, and carried out since May 2002. |
| |
|
 |
| Development of China Railway Ticketing and Reservation System |
|
|
For a long time, China railway ticketing used the conventional model of preparing standing ticket and selling ticket manually, which resulted in a large labor intensity, low work efficiency, disordered seat management and limited ticketing range. |
|
|
 |
| Comprehensive test on Qinhuangdao-Shenyang Dedicated Passenger line |
|
|
The Qinhuangdao-Shenyang dedicated passenger line starts west from Qinhuangdao and ends in Shenyangbei Station via Shanhaiguan in the east and Liaoshen Plain. |
|
|
 |
|